Products
Product Center
BK口R Series Explosion proof Air Conditioner

1. Suitable for Zone 1 and Zone 2 explosive gas environments;

2. Suitable for Class IIA, IIB, and IIC explosive gas environments;

3. Suitable for temperature groups T1~T6;

4. Suitable for hazardous environments such as oil extraction, refining, chemical, military, offshore oil platforms, oil tankers, metal processing, etc;

5. Used for temperature regulation in workshops, control rooms, laboratories, and other areas.


Application
Oil field
Oil field
Chemical industry field
Chemical industry field
Aerospace field
Aerospace field
Coal mining field
Coal mining field
Metallurgical field
Metallurgical field
Pharmaceutical field
Pharmaceutical field
Brewing field
Brewing field
Fire protection field
Fire protection field
Features
Model meaning

171.jpg

Implementation standards

GB/T 3836.1、GB/T 3836.2、GB/T 3836.3、GB/T 3836.4、GB/T 3836.9、IEC60079-0、IEC60079-1、IEC60079-7、IEC60079-11、IEC60079-18

Features

1. Explosion proof air conditioning is made by explosion-proof treatment on the basis of ordinary air conditioning, with reliable explosion-proof performance and no impact on the original air conditioning performance;

2. Explosion proof air conditioners can be divided into split wall mounted and floor standing types according to their structural forms, and can be divided into single cooling and heating/cooling types according to their functions;

3. The connection of explosion-proof air conditioning pipelines is the same as that of ordinary air conditioners. The electrical connection must follow the installation process requirements of explosion-proof electrical appliances. First, introduce the power supply into the explosion-proof control box, and then introduce it into the indoor unit and outdoor unit respectively from the explosion-proof control box;

4. The explosion-proof control box is equipped with a power switch;

5. Steel pipes or cables can be used for wiring.


Detailed specifications


Ecological Cooperation
Ecological Cooperation
Full-service partner
Telephone consultation
Telephone consultation
24/7 hotline service
Submit project requirements
Submit project requirements
Solution presentation within 8 hours
Service and Warranty
Service and Warranty
Technical response within 4 hours